iXAfrica Second Data Centre, East Africa’s First AI-ready Campus
Campus 2 Facility Overview
- 53 MW IT campus
- Rack Density of up to 90KW
- On-chip Liquid cooling option
- Flexible rack density
- 99.999% availability
- Heated water and backup power export
- to local community
- Dedicated office building and training Academy
Specifications
- Phase one power: 5 MW IT
- Future phases: 12 MW IT x 4
- Location: Tilisi
- Mechanical: N+2 with liquid cooling options
- Concurrently maintainable with no single point of failure
- Green power grid
- Nairobi’s grid is among the greenest in the word 93% coming from renewable
- energies