IXAfrica Second Data Centre, East Africa’s First AI Ready Campus

 

Campus 2 Facility Overview

  • 53 MW IT campus
  • Rack Density of up to 90KW
  • On-chip Liquid cooling option
  • Flexible rack density
  • 99.999% availability
  • Heated water and backup power export
  • to local community
  • Dedicated office building and training Academy

Specifications

  • Phase one power: 5 MW IT
  • Future phases: 12 MW IT x 4
  • Location: Tilisi
  • Mechanical: N+2 with liquid cooling options
  • Concurrently maintainable with no single point of failure
  • Green power grid
  • Nairobi’s grid is among the greenest in the word 93% coming from renewable
  • energies

Share This:

Facebook
Twitter
LinkedIn
Pinterest